Two post automotive hoists and lifts are generally bolted to the floor using compression anchors.
Two post lift cracked concrete.
I have purchased a two post lift.
Every repair shop that you go to will always have one these items in their shops because it is easier to fix a car while you are standing up than it is laying down underneath a car with limited light.
Six 6 inches of concrete at 3000 psi is required.
It does have rebar.
Do not install any bendpak lift on expansion seams or on cracked or defective concrete.
Most of our above ground lifts 2 post require 4 inch deep cement with 3000 psi integrity.
Is the crack a result of another pour that resulted in bad adhesion to the first pour.
All 3 4 inch diameter anchors must be a minimum of 6 inches away from any expansion seams control joints or other inconsistencies in the concrete.
The crack from were the post is going are about 12 inches from lift post.
New concrete slab recommendations four post lift models.
I have about 4 1 2 inches of concrete.
The bottom line is this.
The bolts provided with our above ground lifts will do their job if your concrete has not been compromised.
When the lift needs to be replaced the new anchors can not interfere with the old anchor points.
I have worked on both and prefer 2 post the older 2 post dont have latches to keep the arms from moving the result is in the picture the only thing i like 4 post for is brakes or mufflers installing a trans on a 4 post sucks they have 2 post lift up to 15000 lb capacity when you rack a f350 or 450 on a 2 post you have to guess where the center on gravity is if there is a load in back if you.
The concrete has some cracks formed since poured about 5 years ago.
Capacity floorplate chain over.
The bolts are what hold the lift to the concrete.
What are the concrete floor requirements of my lift.
Thickness 3 000 psi.
The bolts are what hold the lift to the concrete.
When fluid starts to leak out tighten the screws.
Four 4 inches of concrete at 3000 psi 12 000 pound two post lifts and higher capacity.
The bottom line is this.
Raise the lift to the first lock then crack the bleeder screws at the top of the cylinders to remove air trapped in the system.
The bolts provided with our above ground lifts will do their.
It so happends one of the post will have to be anchored over some hairline cracks.
Iv tried to insert a pin into the crack but it will not go in the concrete must be stronge in this area for the.
If the old anchor points are too close to the new anchor points the concrete needs to be replaced before the new lift can be installed.
How deep is the crack.
Most of our above ground lifts 2 post require 4 inch deep cement with 3000 psi integrity.
Im getting ready to install a 2 post car lift in my garage.
Is the floor safe to install lift.